Terminal B, Sacramento Intl Airport

Terminal B, Sacramento International Airport

AJ installed 360,000 square feet of metal deck on frame work erected by Schuff Steel for Turner Construction’s Terminal B at the Sacramento International Airport. Sections of seven-inch deep deck with 28-foot spans were assembled on the ground and hoisted into place in one piece, offering considerable savings in crane and labor costs, while cutting critical days out of the schedule.