The Bristol

Project Description

AJ provided load bearing metal framing and BIM coordination services on this high-end condo project. Through early designbuild involvement, AJ used preferred means / methods to reduce the size of floor joists, providing an additional 4" of overhead clearance space throughout the building. AJ also provided interior non-structural wall framing and backing.

Photography © Golden State Photographic

Services

BIM
Exterior Wall Systems
Preconstruction
General Contractor
Cahill Contractors
Location
Yerba Buena Island
Owner
Wilson Meany
Building
Multi-family
Completed
March 2021