Photography © Golden State Photographic
Project Description
AJ provided load bearing metal framing and BIM coordination services on this high-end condo project. Through early designbuild involvement, AJ used preferred means / methods to reduce the size of floor joists, providing an additional 4″ of overhead clearance space throughout the building. AJ also provided interior non-structural wall framing and backing.
Location
Yerba Buena Island
Services
PreConstruction
BIM
Exterior Wall Systems
General Contractor
Cahill Contractors
Owner
Wilson Meany
Building
Multi-family
Completed
March 2021